Skip to main content

Poughkeepsie City School District

Together, We are Champions for Children in Poughkeepsie City Schools

Additional Projects

Cafeteria remodeling

  • Students wait on line in a cafeteria
    PHS
  • Students sit at a lounge in the cafeteria
    PHS
  • Students sit at a table in a cafeteria
    Warring
  • Students sit at a table in a cafeteria
    Warring
  • Students sit at a table in a cafeteria
    Krieger
  • Students sit at a table in a cafeteria
    Krieger

Beginning with Poughkeepsie High School’s cafeteria in fall 2024, the district began an initiative to remodel each cafeteria in its school buildings. The projects have varying scopes, with kitchen upgrades included in several of them, in addition to new decorations and tables bearing school logos. In the case of the high school, the senior lounge was also remodeled.

The most recent school to receive the treatment was Krieger Elementary in October 2025, with Truth the next school slated to see its cafeteria remodeled in December 2025.

Elementary Playgrounds

  • An empty playground
    Smith
  • An empty playground
    Krieger
  • An empty playground
    Warring
  • An empty playground
    Clinton
  • An empty playground
    Truth

In Spring 2024 the Poughkeepsie City School District installed new playground equipment at each of its elementary buildings.